Skip to main content
Smart Cities Marketplace
Scalable cities

Smart control of individual floors with individual rooms control in existing buildings (423)

SRT Data

{"_id":"cluster:triangulum-site-eindhoven_ict_smart-control-of-individual-floors-with-individual-rooms-control-in-existing-buildings-423-","_rev":"27-9eb7798aaf5da2534d3c17c5a656c63b","document_type":"cluster","scis_id":"triangulum-site-eindhoven_ict_smart-control-of-individual-floors-with-individual-rooms-control-in-existing-buildings-423-","cluster_type":"ict","ict_general":{"ict_name":"Sensors have been installed on the half of 6th floor. Each sensor include 5 measurements which are: presence, CO2, temperature, lights and humidity.  The 7th floor is the reference\/control group for energy consumption measurement. In total 29 sensors will be installed in the office building. ","ict_foa_type":"Building","ict_foa_type_building":"Other","ict_foa_year_completion":"2018"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a"},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes"}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number"}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW"},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh"},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW"},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW"},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW"}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#","baseline":31,"intervention":37,"savings":19.354838709677},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#","baseline":0,"intervention":0}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":9614.623,"intervention":9592.577,"savings":0.2292965621221},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a","baseline":176869.606,"intervention":176463.116,"savings":0.22982467660384}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":49000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac","intervention":34300},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a"},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":500},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_citizens_involved":37,"social_jobs_created":0}},"revisions":[{"user":"trinfer","date":"2019-11-07T15:10:15+00:00","reason":"update"},{"user":"trinfer","date":"2019-11-07T15:32:58+00:00","reason":"update"},{"user":"trinfer","date":"2019-11-07T15:34:32+00:00","reason":"update"},{"user":"trinfer","date":"2019-11-14T08:14:26+00:00","reason":"update"},{"user":"trinfer","date":"2019-11-25T19:20:27+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-13T14:34:16+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-18T18:38:56+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-18T18:40:33+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-18T18:41:00+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-18T18:43:42+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-18T20:24:07+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-21T22:01:01+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-22T12:59:17+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-22T13:00:42+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-23T20:34:05+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-28T20:03:15+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-01T13:13:39+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-04T00:53:33+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-04T00:55:35+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-04T01:03:47+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-04T01:04:35+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-04T01:31:57+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-02-04T01:32:16+00:00","reason":"update"},{"user":"rudy.rooth","date":"2024-06-16T11:04:57+02:00","reason":"update"}],"mon":{"year_2019":{"ict_general":{"ict_name":"Sensors have been installed on the half of 6th floor. Each sensor include 5 measurements which are: presence, CO2, temperature, lights and humidity.  The 7th floor is the reference\/control group for energy consumption measurement. In total 29 sensors will be installed in the office building. ","ict_foa_type":"Building","ict_foa_type_building":"Other","ict_foa_year_completion":"2018"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a"},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes"}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number"}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW"},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh"},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW"},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW"},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW"}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#","baseline":31,"intervention":37,"savings":19.3548},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#","baseline":0,"intervention":0}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":41341.08,"intervention":40794.01,"savings":1.3233},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a","baseline":760504.84,"intervention":750444.365,"savings":1.3229}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":49000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac","intervention":34300},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a"},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":500},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_citizens_involved":37,"social_jobs_created":0}}}}}

SRT ID

cluster:triangulum-site-eindhoven_ict_smart-control-of-individual-floors-with-individual-rooms-control-in-existing-buildings-423-