Skip to main content
Smart Cities Marketplace
Scalable cities

Fibre Optic Infrastructure (444a)

SRT Data

{"_id":"cluster:triangulum-site-eindhoven_ict_fibre-optic-infrastructure-444a-","_rev":"51-2132ef65130ec7ed3bd3495b44b376c4","document_type":"cluster","scis_id":"triangulum-site-eindhoven_ict_fibre-optic-infrastructure-444a-","cluster_type":"ict","ict_general":{"ict_name":"500 km of Fibre Optic(Backbone) cables have been installed in ducts in the Strijp S district (68 acres) for improving connectivity in the area. The Fibre Optic network acts as a Backbone for additional data related services in Strijp-S. 227 smart light poles are directly connected to the fibre - 400 poles in total through gateways in the other poles. ","ict_foa_type":"City level","ict_foa_type_city_level":"Other","ict_foa_year_completion":"2020"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a"},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes"}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number"}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW"},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh"},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW"},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW"},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW"}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#"},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#"}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a"},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a"}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":475000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac"},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a"},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a"},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_citizens_involved":30,"social_jobs_created":0}},"revisions":[{"user":"Damian Wagner","date":"2019-05-27T14:49:46+01:00","reason":"update"},{"user":"Clemens Tolboom","date":"2019-06-07T09:25:53+01:00","reason":"Database update: updateDocsForKeyValue #745"},{"user":"Clemens Tolboom","date":"2019-06-07T09:31:02+01:00","reason":"Database update: updateDocsForKeyValue #773"},{"user":"trinfer","date":"2020-01-21T22:02:16+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-21T22:13:02+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-21T22:22:49+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-28T12:46:55+00:00","reason":"update"},{"user":"trinfer","date":"2020-01-28T12:47:52+00:00","reason":"update"},{"user":"Dujuan Yang","date":"2020-01-28T20:03:11+00:00","reason":"update"},{"user":"trinfer","date":"2020-02-01T19:10:45+00:00","reason":"update"}]}

SRT ID

cluster:triangulum-site-eindhoven_ict_fibre-optic-infrastructure-444a-