Skip to main content
Smart Cities Marketplace
Scalable cities

Measure 5.1 Smart street lighting

SRT Data

{"_id":"cluster:growsmarter-site-stockholm-_ict_measure-5-1-smart-street-lighting","_rev":"15-3b9140d0b1171468643fe43266471cd9","document_type":"cluster","scis_id":"growsmarter-site-stockholm-_ict_measure-5-1-smart-street-lighting","cluster_type":"ict","ict_general":{"ict_name":"This measure deploys sensor-contolled LED lighting for pedestrian and bicycle paths to enable the lights to provide base lighting to create a feeling of security at all times and increase the level of lighting when someone approaches","ict_foa_type":"City level","ict_foa_type_city_level":"Smart lampposts"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a"},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes"}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number","baseline":0,"intervention":50}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW"},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh"},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW"},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW"},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW"}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#"},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#"}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":183,"intervention":125,"savings":31.693989071038},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a"}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":1889247},{"key":"grants","kpi_name":"Grants","unit":"\u20ac"},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a","intervention":5026},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":17621},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_jobs_created":7.95}},"revisions":[{"user":"Sigrid Granstrom","date":"2020-01-16T15:33:51+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-16T15:34:09+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-16T15:34:27+00:00","reason":"update"}],"mon":{"year_2018":{"ict_general":{"ict_name":"This measure deploys sensor-contolled LED lighting for pedestrian and bicycle paths to enable the lights to provide base lighting to create a feeling of security at all times and increase the level of lighting when someone approaches","ict_foa_type":"City level","ict_foa_type_city_level":"Smart lampposts"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a"},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes"}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number","baseline":0,"intervention":50}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW"},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh"},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW"},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW"},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW"}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#"},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#"}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":183,"intervention":125,"savings":31.693989071038},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a"}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":1889247},{"key":"grants","kpi_name":"Grants","unit":"\u20ac"},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a","intervention":5026},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":17621},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_jobs_created":7.95}}}}}

SRT ID

cluster:growsmarter-site-stockholm-_ict_measure-5-1-smart-street-lighting