Skip to main content
Smart Cities Marketplace
Scalable cities

Measure 2.1 Integrated multi-modal transport for construction materials/logistics center

SRT Data

{"_id":"cluster:growsmarter-site-stockholm-_infrastructure_measure-2-1-integrated-multi-modal-transport-for-construction-materials-logistics-center","_rev":"25-bb88243f74d9aad30602e8f088571882","document_type":"cluster","scis_id":"growsmarter-site-stockholm-_infrastructure_measure-2-1-integrated-multi-modal-transport-for-construction-materials-logistics-center","cluster_type":"infrastructure","mobility_transport_general":{"mobility_transport_description":"The project \u201cTrik\u00e5fabriken\u201d consists in a construction site where Arcona AB refurbished and built 2 additional floors for the Real-estate company Faberge. About 30% (2981 parcels) of the total amount of all the material for this refurbishment went first to a Logistic center where it got consolidated with other materials and delivered just in time to the construction site when it was needed. Also, bulk deliveries got delivered and that could be divided into consignment for daily works. The comparison was made between the actual output of kilometers, energy and CO2 in a \u201clast mile\u201d perspective and a scenario (base-line) where all material in the same proportion of consignments but with one vehicle for each one."},"mobility_transport_kpis":{"energy_consumption":[{"key":"lpg","mode":"LPG"},{"key":"motor_spirit","mode":"Motor Spirit"},{"key":"kerosene","mode":"Kerosene - Jet Fuels"},{"key":"diesel_oil","mode":"Diesel Oil"},{"key":"heavy_fuel_oil","mode":"Heavy Fuel Oil"},{"key":"natural_gas","mode":"Natural gas"},{"key":"biodiesel","mode":"Biodiesel"},{"key":"electricity_grid","mode":"Electricity - grid"},{"key":"electricity_res","mode":"Electricity - RES"}],"mobility_improvement":[{"key":"e_charging_stations","improvement":"e-hub\/charging\/fueling stations","unit":"outlets"},{"key":"bicycle_lanes_length","improvement":"Deployment of bicycle lanes and pedestrian roads","unit":"km"},{"key":"public_transport_length","improvement":"Deployment of public transport system","unit":"km\/100000 inhabitants"},{"key":"carsharing_locations","improvement":"Car sharing\/car pooling locations","unit":"spaces"}],"kms":[{"key":"passenger_kilometer","mode":"passenger-kilometer"}],"environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":1090.7,"intervention":595.4,"savings":45.4112},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand","unit":"kWh\/a","baseline":451.6,"intervention":437.3,"savings":3.1665}],"economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":85000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac"},{"key":"net_energy_savings","kpi_name":"Net energy savings\/value of improvements","unit":"\u20ac\/a"},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":225000},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_jobs_created":0.1}},"revisions":[{"user":"Sigrid Granstrom","date":"2019-11-13T15:14:49+00:00","reason":"update"},{"user":"admin","date":"2019-11-14T14:42:56+01:00","reason":"Database update: updateDocsForKeyValue #851"},{"user":"admin","date":"2019-11-14T14:43:32+01:00","reason":"Database update: updateDocsForKeyValue #851"},{"user":"Sigrid Granstrom","date":"2020-01-16T14:07:13+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-16T14:09:47+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-16T14:15:09+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-16T14:15:55+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-16T14:21:19+00:00","reason":"update"},{"user":"Sigrid Granstrom","date":"2020-01-24T13:33:52+00:00","reason":"update"},{"user":"rudy.rooth","date":"2024-02-21T11:22:41+01:00","reason":"update"},{"user":"rudy.rooth","date":"2024-02-21T11:23:19+01:00","reason":"update"}],"mon":{"year_2018":{"mobility_transport_general":{"mobility_transport_description":"The project \u201cTrik\u00e5fabriken\u201d consists in a construction site where Arcona AB refurbished and built 2 additional floors for the Real-estate company Faberge. About 30% (2981 parcels) of the total amount of all the material for this refurbishment went first to a Logistic center where it got consolidated with other materials and delivered just in time to the construction site when it was needed. Also, bulk deliveries got delivered and that could be divided into consignment for daily works. The comparison was made between the actual output of kilometers, energy and CO2 in a \u201clast mile\u201d perspective and a scenario (base-line) where all material in the same proportion of consignments but with one vehicle for each one."},"mobility_transport_kpis":{"energy_consumption":[{"key":"lpg","mode":"LPG"},{"key":"motor_spirit","mode":"Motor Spirit"},{"key":"kerosene","mode":"Kerosene - Jet Fuels"},{"key":"diesel_oil","mode":"Diesel Oil"},{"key":"heavy_fuel_oil","mode":"Heavy Fuel Oil"},{"key":"natural_gas","mode":"Natural gas"},{"key":"biodiesel","mode":"Biodiesel"},{"key":"electricity_grid","mode":"Electricity - grid"},{"key":"electricity_res","mode":"Electricity - RES"}],"mobility_improvement":[{"key":"e_charging_stations","improvement":"e-hub\/charging\/fueling stations","unit":"outlets"},{"key":"bicycle_lanes_length","improvement":"Deployment of bicycle lanes and pedestrian roads","unit":"km"},{"key":"public_transport_length","improvement":"Deployment of public transport system","unit":"km\/100000 inhabitants"},{"key":"carsharing_locations","improvement":"Car sharing\/car pooling locations","unit":"spaces"}],"kms":[{"key":"passenger_kilometer","mode":"passenger-kilometer"}],"environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":1090.7,"intervention":386.4,"savings":64.5732},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand","unit":"kWh\/a"}],"economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":85000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac"},{"key":"net_energy_savings","kpi_name":"Net energy savings\/value of improvements","unit":"\u20ac\/a"},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":225000},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_jobs_created":0.1}}}}}

SRT ID

cluster:growsmarter-site-stockholm-_infrastructure_measure-2-1-integrated-multi-modal-transport-for-construction-materials-logistics-center