Skip to main content
Smart Cities Marketplace
Scalable cities

U6- peak load management

SRT Data

{"document_type":"cluster","scis_id":"ruggedised-ume-_ict_u6--peak-load-management","cluster_type":"ict","ict_general":{"ict_name":"E-charging-hub\/charging infrastructure  E- charging facilities will be essential to ensure the roll out of electric vehicles in the area. A charging hub for e-vehicals will be developed, with charging facilities for  e-cars and car-share. By installing PV plants along with energy storage, advanced monitoring and governing systems and charging points of electric vehicles within the innovation area, good results will be gained in terms of reducing building energy consumption, as well as systemic effects such as decreasing peak loads. Existing battries will be tested and the storage soulution will be developed within the project. One example is that the area holds of a large number of work place parking spaces and every parking has an electric engine-preheater that all starts running around 3 pm, a few hours before people are planning to leave work \u2013 the power system is already under strain at these hours. When th  E-vehicle charging hub is added to the system the need of a smart power control management-system is needed. A dynamic payment system for the charging, will also be tested. ","ict_foa_type":"Energy System(s) Integration","ict_foa_type_esi":"Demand Response","ict_foa_year_completion":"2019.11.01"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a","baseline":0,"intervention":0},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes","baseline":0,"intervention":0}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number","baseline":0,"intervention":0}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW","baseline":0,"intervention":0.096},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh","baseline":0.0405,"intervention":0.0405,"savings":0},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW","baseline":0.0573,"intervention":0.0516,"savings":9.947643979057586},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW","baseline":0,"intervention":0.026},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW","baseline":0,"intervention":0.096}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#","baseline":0,"intervention":0},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#","baseline":0,"intervention":0}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":22814,"intervention":20663,"savings":9.42842114491102},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a","baseline":514061,"intervention":465597,"savings":9.427674925738385}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":60000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac","intervention":45500},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a","intervention":0},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":9433},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_citizens_involved":0,"social_jobs_created":0.45}},"_id":"cluster:ruggedised-ume-_ict_u6--peak-load-management","revisions":[{"user":"Tobias.Gunneberg","date":"2022-06-15T17:31:10+02:00","reason":"update"},{"user":"Tobias.Gunneberg","date":"2022-06-20T11:57:41+02:00","reason":"update"},{"user":"Tobias.Gunneberg","date":"2022-06-20T14:11:35+02:00","reason":"update"},{"user":"Tobias.Gunneberg","date":"2022-06-21T08:54:34+02:00","reason":"update"}]}

SRT ID

cluster:ruggedised-ume-_ict_u6--peak-load-management