Skip to main content
Smart Cities Marketplace
Scalable cities

U2B- Peak load variation management district heating

SRT Data

{"document_type":"cluster","scis_id":"ruggedised-ume-_ict_u2b--peak-load-variation-management-district-heating-","cluster_type":"ict","ict_general":{"ict_name":"B. Power Control: The current platform has been successfully tested on a smaller scale for a number of years and Ume\u00e5 domain experts have had good experiences with the technology applied. Tests with manual control simulating ","ict_foa_type":"Energy System(s) Integration","ict_foa_type_esi":"Smart district heating and cooling grids - demand","ict_foa_year_completion":"2019.11.01"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a","baseline":0,"intervention":0},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes","baseline":0,"intervention":0}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number","baseline":0,"intervention":0}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW","baseline":0,"intervention":0},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh","baseline":0.04766,"intervention":0.04766,"savings":0},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW","baseline":9.3574,"intervention":8,"savings":14.506166242759742},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW","baseline":0,"intervention":0},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW","baseline":0,"intervention":0}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#","baseline":0,"intervention":0},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#","baseline":0,"intervention":0}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":702241,"intervention":664186,"savings":5.419079774607293},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a","baseline":10972522,"intervention":10377900,"savings":5.41919168628689}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":64333},{"key":"grants","kpi_name":"Grants","unit":"\u20ac","intervention":32167},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a","intervention":0},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":22333},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_citizens_involved":0,"social_jobs_created":0.267}},"_id":"cluster:ruggedised-ume-_ict_u2b--peak-load-variation-management-district-heating-","revisions":[{"user":"Tobias.Gunneberg","date":"2022-06-14T13:15:10+02:00","reason":"update"},{"user":"Tobias.Gunneberg","date":"2022-06-21T06:44:43+02:00","reason":"update"},{"user":"Tobias.Gunneberg","date":"2022-06-21T06:49:34+02:00","reason":"update"},{"user":"Tobias.Gunneberg","date":"2022-06-21T06:58:43+02:00","reason":"update"},{"user":"Daniel Horak","date":"2022-10-24T15:56:47+02:00","reason":"update"},{"user":"Daniel Horak","date":"2022-10-25T10:39:55+02:00","reason":"update"},{"user":"Daniel Horak","date":"2022-10-25T14:16:58+02:00","reason":"update"},{"user":"Daniel Horak","date":"2022-10-25T14:23:32+02:00","reason":"update"},{"user":"Daniel Horak","date":"2022-10-25T15:25:10+02:00","reason":"update"}],"mon":{"year_2021":{"ict_general":{"ict_name":"B. Power Control: The current platform has been successfully tested on a smaller scale for a number of years and Ume\u00e5 domain experts have had good experiences with the technology applied. Tests with manual control simulating ","ict_foa_type":"Energy System(s) Integration","ict_foa_type_esi":"Smart district heating and cooling grids - demand","ict_foa_year_completion":"2019.11.01"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a","baseline":0,"intervention":0},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes","baseline":0,"intervention":0}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number","baseline":0,"intervention":0}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW","baseline":0,"intervention":0},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh","baseline":0,"intervention":0},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW","baseline":9.39,"intervention":7.92,"savings":15.655},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW","baseline":0,"intervention":0},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW","baseline":0,"intervention":0}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#","baseline":0,"intervention":0},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#","baseline":0,"intervention":0}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a","baseline":1180501.468,"intervention":1128214.262,"savings":4.4292},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a","baseline":5048064.979,"intervention":5001655.167,"savings":0.9194}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac"},{"key":"grants","kpi_name":"Grants","unit":"\u20ac"},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a"},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a"},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%"}],"social":{"social_citizens_involved":0}}}}}

SRT ID

cluster:ruggedised-ume-_ict_u2b--peak-load-variation-management-district-heating-