Skip to main content
Smart Cities Marketplace
Scalable cities

New BMS installed

SRT Data

{"_id":"cluster:hit2gap-san-sebasti-n_ict_new-bms-installed","_rev":"31-cdfe9db68229801b3a7c5f9aeb19e8c9","document_type":"cluster","scis_id":"hit2gap-san-sebasti-n_ict_new-bms-installed","cluster_type":"ict","ict_general":{"ict_name":"Replacement of the current BMS by a new BMS (DESIGO CC) that enables an effective control of the building","ict_foa_type":"Energy System(s) Integration","ict_foa_type_esi":"Neighbourhood Energy Management System","ict_foa_year_completion":"09\/08\/2019"},"ict_kpis":{"ict_reliability":[{"key":"ict_reliability","kpi_name":"Reliability in terms of power interruptions","unit":"number\/a"},{"key":"ict_power_quality_supply","kpi_name":"Power Quality and Quality of Supply (DSO+TSO): Time needed for awareness of grid faults","unit":"minutes"}],"ict_infrastructure":[{"key":"lampposts","kpi_name":"Amount of smart lampposts","unit":"number"}],"ict_system_integration":[{"key":"ict_increased_flexibility","kpi_name":"Flexibility from energy players by increase of load capacity participating in demand side management","unit":"MW"},{"key":"ict_energy_reduction_cost","kpi_name":"Energy price (averaged over a year)","unit":"\u20ac\/kWh"},{"key":"ict_peak_load_reduction","kpi_name":"Peak load level","unit":"MW"},{"key":"ict_increased_hosting_capacity","kpi_name":"RES and DER hosting capacity","unit":"MW"},{"key":"ict_hosting_capacity_electrical_vehicles","kpi_name":"Hosting capacity for electric vehicles and other new loads","unit":"MW"}],"ict_consumers_engagement":[{"key":"ict_number_final_users","kpi_name":"Number of end users involved","unit":"#","baseline":0,"intervention":3},{"key":"ict_people_with_increased_capacity","kpi_name":"Number of people with increased ability to manage their energy consumption","unit":"#","baseline":0,"intervention":3}],"ict_environmental":[{"key":"total_co2_emissions","kpi_name":"Total CO2 Emissions","unit":"kgCO2eq\/a"},{"key":"final_total_primary_energy_demand","kpi_name":"Total Primary Energy Demand (due to the ICT measure implemented)","unit":"kWh\/a","baseline":1370286,"intervention":1245286,"savings":9.1221832522554}],"ict_economic":[{"key":"total_investment","kpi_name":"Total Investments (excl. VAT)","unit":"\u20ac","intervention":35000},{"key":"grants","kpi_name":"Grants","unit":"\u20ac","intervention":0},{"key":"net_energy_savings","kpi_name":"Annual value of improvements","unit":"\u20ac\/a","intervention":0},{"key":"total_operating_costs","kpi_name":"Total Operating costs","unit":"\u20ac\/a","intervention":0},{"key":"dynamic_payback_period","kpi_name":"Dynamic Payback Period","unit":"a"},{"key":"return_investment","kpi_name":"Return on Investment","unit":"%","intervention":100}],"social":{}},"revisions":[{"user":"Andoni Anero","date":"2019-08-22T11:35:41+02:00","reason":"update"},{"user":"Andoni Anero","date":"2019-08-22T11:48:46+02:00","reason":"update"},{"user":"Andoni Anero","date":"2019-08-22T13:26:29+02:00","reason":"update"}]}

SRT ID

cluster:hit2gap-san-sebasti-n_ict_new-bms-installed